San Andreas Wastewater Treatment Plant Improvements

Blackburn Consulting prepared various Geotechnical Design Reports for three proposed storage reservoir dams, the Pond D expansion project, the office/shop building and parking lot, and the wastewater treatment plant upgrades.  Improvements to the wastewater treatment plant included taking the existing plant from its existing capacity to 3.2mg/day.  Specific improvements include new aeration basins, clarifiers, pump stations, and associates mechanical/electrical and office/shop buildings. Blackburn provided lateral force, bearing capacity, cut and fill slope, excavatability, grading, and pavement and gravel driveway recommendations.  

Location Calaveras County, CA
Agency/Owner San Andreas Sanitary District
Timeframe 2007 to 2010